Project Details

Sebeta, Ethiopia

Diageo Meta Abo Power Infrastructure Project

Client:

Diageo

Completion:

Jun 2, 2015

Project Type:

Industrial

Project Value

Undisclosed NDA

Project Detail:

Diageo Meta Abo Power Infrastructure Project Designer Group’s Role: Further to Diageo’s acquisition of Meta Abo Brewery in Addis Ababa from the Ethiopian state, there followed a significant capital investment to bring the brewery up to current Western standards and increase production. Designer Group were employed on a design to upgrade the current main mechanical power infrastructure for the plant. This involved full replacement of MCC panels along with power and control wiring for all utilities on site. Subsequent to the successful delivery of this project, Designer Group were successful in winning the G5 Power Generation & High voltage infrastructure project. This project included Diesel Power Generation, 24KV switch gear, HV cabling and modifications and upgrades to main power infrastructure control systems.