Client:
M + W Group
Completion:
Project Type:
Energy, Biomass & Renewables
Project Value
£9.1m
Project Detail:
SUEZ
Description: Gasification Building and Office Fit Out
The innovative new Eco Park is being developed by SUEZ as part of its 25-year PFI contract with Surrey County Council. They will take general waste, collected from homes in Northern Surrey and from some local businesses, into this processing plant which incorporates Anaerobic Digestion to process some 40,000 tonnes of food waste and the latest fluidised bed gasification technology producing syngas from Refuse Derived Fuel to provide 35MWe energy to the national grid, enough to power up to 8,000 homes.
Under this contract Designer Group will be responsible for the electrical design, supply and installation works to the new gasification building. The works consist of new power and control cabling, emergency generator systems, UPS, ladder containment, earthing, lighting and small power.