International Broadcast Centre

London, UK

The media centre building for the London Olympic Games in 2012 facilitated an estimated 12,000 media staff. Here, media organisations from all over the world positioned their studios, editing equipment and offices for the duration of the games. The 60,000 m² site contained 160 recording studios.

Client

FCC Environment

Location

London, UK

Project Value

£17M

Programme

October 2021

In preparation for this project our team visited the media centre building in Vancouver, Canada, which was constructed for the Winter Olympic Games. Commercial We also witnessed the decommissioning and strip out of the building at the end of the Winter Games. The Olympic games were fast approaching so there was a narrow time-line for both the construction and strip out elements of this project. On the completion of the Games, the building was returned to its original shell and core condition by the construction team.

Case Studies / DHAS Data Centre

Mechanical Installation
Air Source Heat Pumps BMS BMS Controls Chillers Ductwork Ventilation Show More Show Less
Electrical Installation
Access Control Distribution Fire Alarm Fire Alarm PA-VA Lighting & Lighting Control Lighting Control Show More Show Less